“maintenance Plan”

we Have Created One Plan Area Wise / Section Wise Machinery, At Header Level Given One Equipment & Others Attached In The Object List.

the System Is Generating Order For Header Equipment & History Also On The Same List.

is It Possible We Can See Or Maintain History For All Equipment Which Are Attached In The Object List?

can The System Generate A Different Order For Each Of The Equipment?

is There Any Other Solution To Maintain The History For All These Equipment By A Single Plan?

“authorization And Order Type”

we Must Create An Activity Group Which Allows Users To Create, Change And Display Certain Order Types. Also We Must Add Authorization For Another Order Type For These Users, But They Should Only Be Able To Display These Orders. Our Release Is 46b. We Don’t Have User-exit Iwo10033.

“requirement Date For Components”

can Anyone Tell Me If It’s Possible To Have Different Requirements Dates For Materials On The Component List Of A Work Order.

we Have A Number Of Components That Are Required On Different Days.

i Tried Using The Off-set, But With No Luck.

it Appears That The Requirement Date Is The Same As The Basic Start Date; Can This Be Changed For Each Component?

“billing Plan”

when Creating The Billing Document From The Repair Request The Billing Date Is Taking The Repair Request Create Date. How Do I Appoint The Billing Date As The Current Date?

“availability Control For Cost Center”

the Requirement Is That The Client Wants To Control The Budget At Cost Center Level.

budget Is Maintained For Cost Centers Using The Tcode Kpz2 For The Fiscal Year Month Wise. At The Time Of Posting Goods Issue Or Time Confirmation Or Service Entry Sheet For The Maintenance Order, If The Amount Exceeds The Budget, The System Should Give Message.

for Order And Project, Availability Control Is There By Default In Sap.

could You Please Give Some Input On Budget Control At Cost Centers?

“equipment Installation At F/l”

what Is The Purpose Of “position” Field For Equipment Installation At Functional Location?

can I Give Serial Numbers Like 1, 2, 3 … For That Or Any Other Exact Specification?

“message C7 057 No Valid Capacity For Finite Scheduling”

the Following Message Was Received When Trying To Confirm An Order:

“{work Center Has Finite Scheduling Ticked”.

the Same Work Center Could Confirm Other Orders. This Is The First Confirmation For The Work Center In Question. Meanwhile, Other Confirmation Exists For Other Work Centers.

“ip19 Scheduling Overview (gantt Chart)”

i Want To Save The Scheduling Overview Gantt Chart In Excel Format.

how Can This Be Accomplished?

“structural Display”

i Have The Equipment And Sub Equipment.

my Equipment Is Installed In Functional Location And The Sub Equipment Installed In Equipment.

when I Go To T.code Ih01 I Am Not Able To See The Sub Equipment In That Structural Display.

what Is The Transaction To View All F/l, Equipment And Sub Equipment?

i Have Checked All Boxes (location Hierarchy, Equipment Installed, Equipment Hierarchy, Expand Assembly, And Valid Date Is Current Date.). However, It Is Still Showing F/l Only.

“superior Order And Sub Order”

i Want To Use The Sub-orders. However, I Have A Few Doubts And Would Like To Clarify Some Issues Before I Begin:

  1. after The Settlement Of Sub Order To Superior Order, Will I See The Actual Cost Of Sub Order In Main Work Order?
  2. where Can We Find The List Of Sub Order For One Superior Order With All Values And Order Numbers?