Home Modern › Forums › ISRO › Which of the following is not a maturity level as per Capability Maturity Model? Which of the following is not a maturity level as per Capability Maturity Model?
(A) Initial
(B) Measurable
(C) Repeatable
(D) Optimized
(A) Initial
(B) Measurable
(C) Repeatable
(D) Optimized
nan