Consider a 5-segment pipeline with a clock cycle time 20 ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (If an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline.).
(A) 5
(B) 4.03
(C) 4.81
(D) 4.17
Home Modern › Forums › ISRO › Consider a 5-segment pipeline with a clock cycle time 20 ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (If an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline.). Consider a 5-segment pipeline with a clock cycle time 20 ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (If an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline.).
(A) 5
(B) 4.03
(C) 4.81
(D) 4.17
(A) 5
(B) 4.03
(C) 4.81
(D) 4.17
nan