Home Modern Forums ISRO

Consider a 5-segment pipeline with a clock cycle time 20 ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (If an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline.).
(A) 5
(B) 4.03
(C) 4.81
(D) 4.17

Reply To:

Consider a 5-segment pipeline with a clock cycle time 20 ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (If an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline.).
(A) 5
(B) 4.03
(C) 4.81
(D) 4.17

Up
0
Down
::

nan