Q:

Which of the following is not a maturity level as per Capability Maturity Model?
(A) Initial
(B) Measurable
(C) Repeatable
(D) Optimized

ISRO

All Replies

Viewing 1 replies (of 1 total)

Viewing 1 replies (of 1 total)

  • You must be logged in to reply to this topic.