Which of the following is not a maturity level as per Capability Maturity Model?
(A) Initial
(B) Measurable
(C) Repeatable
(D) Optimized
All Replies
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- You must be logged in to reply to this topic.