A takes 10 days less than the time taken by B to finish a piece of work. If both A and B together can finish the work in 12 days, find the time taken by B to finish the work. |
Answer» Let the number of days in which B finishes the work be ‘b’. ∴ Number of days in which A finishes the work = b – 10 In 1 day, B finishes 1/b of the work A finishes 1/(b – 10) of the work Now, both A and B together can finish the work in 12 days \(\Rightarrow \frac{1}{b}+\frac{1}{b\,-10}=\frac{1}{12}\) ⇒ 12(b – 10 + b) = b2 – 10b ⇒ 24b – 120 = b2 – 10b ⇒ b2 - 34b + 120 = 0 ⇒ b2 -30b – 4b + 120 = 0 ⇒ b(b – 30) – 4(b – 30) = 0 ⇒ b = 4, 30 b can’t be 4 as A takes 10 days less than B Thus number of days in which B alone finishes the work is 30 days. |
|