 
                 
                InterviewSolution
| 1. | What are the weaving cost formulas? | 
| Answer» Answer: There is an example given below Explanation: A company developed single jersey cotton fabric for the kids wear garment. The company sourced 2000 kg of yarn and the price of the yarn is Tk. 240 / kg. The knitting industry works with 5 weft knitting machine with the production CAPACITY of 85 kg / machine. The average waste percentage expected during the operation is 3%. The company works with 5 operators and 2 helpers with the wage of Tk. 250 and Tk. 150 per shift, respectively. Calculate the cost of knitting process per kilogram with 20% profit if the company spends Tk. 5000 / MONTH for rent, Tk. 3000 / month for electricity and Tk.15,000 / month as other expenses. ASSUME company works 26 days per month. Solution: Step 1: Number of shifts required to complete the order. Total production per day = Average machine production × Number of machines = 85 × 5 = 425 kg / shift The wastage percentage expected = 3% Hence, 2000 kg – (3% of 2000 kg) = the original quantity produced = 2000 – (2000 x 3/100) = 1940 kg Total yarn quantity Total number of shifts required = ---------------------------------------------------------- Production capacity per shift 2000 = --------------- 425 = 4.7 shifts Step 2: Calculate total labour cost The labour cost = No. of labours × No. of shifts worked to complete order × Wages/shift = Cost of operators + Cost of helpers = (5 ×4.7× 250) + (2 ×4.7× 150) = Tk. 5875 + Tk.1410 = Tk. 7285 Step 3: Calculation of direct material cost Yarn purchased = 2000 kg with the price of Tk. 240 / kg = 2000 × 240 = Tk. 4,80,000 Step 4: Calculation of overheads Company spends all these overheads per month (26 days). Since, the company works one shift per day, The 1 day or 1 shift expense as overhead is as follows, 5000 + 3000 + 15,000 Overheads = ---------------------------------------- 26 = Tk. 884.61 Since, the company works 4.7 shifts for this order, = 884.61 × 4.7 shifts = Tk. 4157.69 Step 5: The overall cost of the knitting process Material cost + Labour cost + Overheads The total knitted fabric cost / kg = -------------------------------------------------------------------------- Total production 4,80,000 + 7285 + 4157.69 Fabric cost / kg = ---------------------------------------- 1940 = Tk. 253.32 Labour cost Overheads Knitting cost / kg = ---------------------------------- Total production 7285 + 4157.69 = ------------------------------- 1940 = Tk. 5.89 Knitting RATE / kg = 5.89 × 20% profit= 5.89 + (5.89× 20/100) = Tk. 7.07 | |