28 men can do a piece of work in 15 days. How many men are required to complete the same work in 42 days?1. 102. 12 3. 15 4. 20

Answer» Correct Answer - Option 1 : 10

Given:

28 men can do the work in 15 days

Formula used:

(M1 × D1 × T1)/W1 = (M2 × D2 × T2)/W2

Calculation:

We know that,

Work is the same W1 =W2

Let M1 be 28

Let D1 be 15

Let M2 be x

Let D2 be 42

28 × 15 = x × 42

⇒ x = (28 × 15)/42

⇒ x = 10

Men required to complete the work in 42 days is 10.