4 men and 8 boys can build a wall in 5 days, whereas 2 men and 6 boys can build a same wall in 8 days. In how many days can the same wall be built by 2 men and 4 boys1. 8 days2. 10 days3. 12 days4. 16 days

Answer» Correct Answer - Option 2 : 10 days

Given:

4 men + 8 boys, build a wall in 5 days

2 men + 6 boys, build a wall in 8 days.

Formula Used:

(m× d1 × t1 × e1/w1 × c1) = (m2 × d2 × t2 × e2/w2 × c2)

m = number of men required to complete the work

d = number of days required to complete the work

t = time used for work in a single day

e = efficiency of man

w = amount of work

c = consumption of a man 

Calculation:

Using the above formula,

⇒ (4m + 8b) × 5 days = (2m + 6b) × 8 days

⇒ 20m + 40b = 16m + 48b

⇒ 20m – 16m = 48b – 40b

⇒ 4m = 8b

⇒ m : b = 2 : 1

The efficiency of a Man and a Boy is 2, and 1 respectively.

Now the same wall built by 2 men and 4 boys

Let the number of days required be x days

⇒ (4m + 8b) × 5 days = (2m + 4b) × x

⇒ {4(2) + 8(1)} × 5 = {2(2) + 4(1)} × x

⇒ (8 + 8) × 5 = (4 + 4) × x

⇒ x = (16 × 5)/8

⇒ x = 10

∴ The number of days taken by 2 men and 4 boys to build the same wall is 10 days.