1.

4. Work energy power A man pulls a bucket full of water from h metre deep well If the mass of the rope is m and the mass of the bucket with water is M Then work done by the man is

Answer» 4. Work energy power A man pulls a bucket full of water from h metre deep well If the mass of the rope is m and the mass of the bucket with water is M Then work done by the man is


Discussion

No Comment Found

Related InterviewSolutions