Saved Bookmarks
| 1. |
A And B Can Together Finish A Work In 30 Days. They Worked Together For 20 Days And Then B Left. After Another 20 Days, A Finished The Remaining Work. In How Many Days A Alone Can Finish The Job ? |
|
Answer»
so (A&B) 20 days work = (20*1/30) = 2/3 so LEFT work = (1?2/3)=1/3 1/3 work is done by A = 20 days. So whole work will be done by A = (20 x 3) = 60 days. (A + B)'s 1 day's work = 1/30 so (A&B) 20 days work = (20*1/30) = 2/3 so left work = (1?2/3)=1/3 1/3 work is done by A = 20 days. So whole work will be done by A = (20 x 3) = 60 days. |
|