A cart of weight 10N is pulled 1.2 m up a ramp by an applied force of magnitude 5.0 N (parallel to the ramp), raising the cart 0.50 m above its initial level. Calculate the percentage efficiency of the work? |
|
Answer» A cart of weight 10N is pulled 1.2 m up a ramp by an applied force of magnitude 5.0 N (parallel to the ramp), raising the cart 0.50 m above its initial level. Calculate the percentage efficiency of the work? |
|