InterviewSolution
Saved Bookmarks
| 1. |
A cart of weight 10N is pulled 1.2m up a ramp by an applied force of magnitude 5.0N (parallel to the ramp), raising the cart 0.50m above its initial level. Calculate percent efficiency of the work? |
|
Answer» A cart of weight 10N is pulled 1.2m up a ramp by an applied force of magnitude 5.0N (parallel to the ramp), raising the cart 0.50m above its initial level. Calculate percent efficiency of the work? |
|