A cement concrete pavement has thickness of 25 cm and of two lanes with a longitudinal joint along the centre. if the coefficient of friction (f) is 1.5 then the area of steel required per meter is cm2 [Take γconcrete=2400kg/m3 and σs=1400kg/cm2, width of pavement, w = 3.5 m]2.25 |
|
Answer» A cement concrete pavement has thickness of 25 cm and of two lanes with a longitudinal joint along the centre. if the coefficient of friction (f) is 1.5 then the area of steel required per meter is
|
|