1.

A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹100, then find the cost of gold plating the outer surface of the box.

Answer» A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹100, then find the cost of gold plating the outer surface of the box.


Discussion

No Comment Found

Related InterviewSolutions