Saved Bookmarks
| 1. |
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months? |
||||||
|
Answer» Let the number of men required be ‘x’ men Total men = 420
We know k = xy 420 × 9 = x × 7 x = (420×9)/7 = 540 So, 540 – 420 = 120 Men ∴ 120 extra men are required to finish the job in 7 months. |
|||||||