InterviewSolution
 Saved Bookmarks
    				| 1. | 
                                    At a hydroelectric power plant, the water pressure head is at a height of 300 m and the water flow available is 100 m3 s−1. If the turbine generator efficiency is 60%, estimate the electric power available from the plant (g= 9.8 m s−2). | 
                            
| 
                                   
Answer»  At
  | 
                            |