By how many minutes is the complete energy of the rotating parts and the machine is brought to rest?(a) 2 minutes(b) 1 minute(c) 3 minutes(d) 4 minutesI had been asked this question during an interview.My doubt is from Construction of Hydro-Generators in division Design of Synchronous Machines of Design of Electrical Machines

Answer»

Correct OPTION is (C) 3 minutes

The explanation: The brakes are so designed such that the complete energy of the rotating parts and the MACHINE is brought to rest. It is brought to rest by 3 minutes.