| 1. |
Can Mrp Be Carried Out For One Particular Level Of A Bom ( Level Code : 0001/0002 Etc)? |
|
Answer» YES it can be DONE by running for specific materials (SINGLE Material Single LEVEL). Yes it can be done by running for specific materials (Single Material Single Level). |
|