Can Mrp Be Carried Out For One Particular Level Of A Bom ( Level Code : 0001/0002 Etc)?

Answer»

YES it can be DONE by running for specific materials (SINGLE Material Single LEVEL).

Yes it can be done by running for specific materials (Single Material Single Level).