1.

Can't One Material Be Assigned To More Than One Operation In A Routing?

Answer»

ONE material from a BOM CANNOT be assigned to different OPERATIONS. It can be DONE by defining the material for so many TIMES as required in the BOM

One material from a BOM CANNOT be assigned to different Operations. It can be done by defining the material for so many times as required in the BOM