1.

___________ cost of maintenance of the structure __________ construction due to quality works.(a) Maximize, after(b) Minimize, after(c) Maximize, before(d) Minimize, beforeI have been asked this question in unit test.Question is from Advantages of Quality Control in portion Quality Control of Concrete Technology

Answer»

The correct option is (B) Minimize, after

Best explanation: Minimize the cost of REPAIR and MAINTENANCE of the structure after CONSTRUCTION due to quality works.



Discussion

No Comment Found

Related InterviewSolutions