InterviewSolution
Saved Bookmarks
| 1. |
___________ cost of maintenance of the structure __________ construction due to quality works.(a) Maximize, after(b) Minimize, after(c) Maximize, before(d) Minimize, beforeI have been asked this question in unit test.Question is from Advantages of Quality Control in portion Quality Control of Concrete Technology |
|
Answer» The correct option is (B) Minimize, after |
|