1.

Direct material =$10,000 direct labour = 15,000manufacturing overhead =5,000calculate the prime cost ​

Answer»

D ANSWER:-DIRECT MATERIAL COST=$10,000DIRECT LABOUR COST=$15,000MANUFACTURING OVERHEAD=5,000NOW TOTAL THESE AMOUNT= $10000+$15000+$5000=30,000.