1.

Explain Step By Step Procedure To Setup New Host?

Answer»
  • Let us assume CABLE connectivity is DONE PROPERLY
  • Install HBA drivers in host. 
  • Install Power path if required. 
  • Check that the HBA ports are showing online. 
  • Create zoning at switch end. 
  • Check that this host is logged in to the Storage array 
  • Create LUN/hyper in storage array. 
  • Form META devices if required. 
  • Map the devices to the FA port. 
  • Mask the devices to the host hba (wwn). 
  • Refresh the Array to affect the changes.



Discussion

No Comment Found