InterviewSolution
Saved Bookmarks
| 1. |
Find the work done in lifting 5 cement bags, each of mass 25 kg to the top of a building of height 50 m.(consider g=10 m/s2) |
|
Answer» Find the work done in lifting 5 cement bags, each of mass 25 kg to the top of a building of height 50 m.(consider g=10 m/s2) |
|