InterviewSolution
Saved Bookmarks
| 1. |
Ganesh, Ram and Sohan together can complete a work in 16 days. If Ganesh and Ram together can complete the same work in 24 days. The number ofdays Sohan alone takes, to finish the work is1). 402). 483). 324). 30 |
|
Answer» it from previous year SSC papers, OPTION 2 is the RIGHT answer |
|