How Can You Define The Critical Path In Primavera? |
|
Answer» Its the LONGEST path through the PROJECT with the least AMOUNT of FLOAT,Filter the activities with TOTAL float equal to or less than 0. Its the longest path through the project with the least amount of float,Filter the activities with total float equal to or less than 0. |
|