How Do Primary Costs Get Picked Up From Cost Center Into The Cost Component Structure?

Answer»

This is possible when you do a PLAN activity price CALCULATION from SAP. The primary cost component STRUCTURE is assigned to the plan version 0 in Controlling.

This is possible when you do a plan activity price calculation from SAP. The primary cost component structure is assigned to the plan version 0 in Controlling.