InterviewSolution
| 1. |
How Do You Install The New Machines And Layout Preparation As A Production Or Process Engineer? |
|
Answer» Firstly, we make the process plan of the components and according to it, I draw the layout of the machines and make sure that machines should be in arrangement according to the next PROCESSES. Then, I also CHECK to MAINTAIN the distance between the machines. We install the machines for maximum time SAVING and provide proper safety to the workers. Firstly, we make the process plan of the components and according to it, I draw the layout of the machines and make sure that machines should be in arrangement according to the next processes. Then, I also check to maintain the distance between the machines. We install the machines for maximum time saving and provide proper safety to the workers. |
|