How Does Sap Calculate Work In Process (wip) In Product Cost By Order?

Answer»

The system first runs through all the production ORDER for the month and checks for the status of each production order. If the status of the production order is REL (Released) or PREL (Partially released) and if COSTS are incurred for that order system calculates WIP for the production order.

The system cancels the WIP for the production order when the status of the order becomes DLV (delivered) or TECO (Technically complete).

The system first runs through all the production order for the month and checks for the status of each production order. If the status of the production order is REL (Released) or PREL (Partially released) and if costs are incurred for that order system calculates WIP for the production order.

The system cancels the WIP for the production order when the status of the order becomes DLV (delivered) or TECO (Technically complete).