InterviewSolution
Saved Bookmarks
| 1. |
How Does Sap Go About Costing A Product Having Multiple Bill Of Materials Within It? |
|
Answer» SAP first COSTS the lowest LEVEL product, ARRIVES at the cost and then goes and cost the next HIGHEST level and finally arrives at the cost of the FINAL product. SAP first costs the lowest level product, arrives at the cost and then goes and cost the next highest level and finally arrives at the cost of the final product. |
|