It is possible through overhead groups. You configure 2 overhead keys. DEFINE RATES for each of this overhead key. These two overhead keys is then assigned to the two overhead groups. These overhead groups are ATTACHED in the costing view of the finished goods MATERIAL master.

It is possible through overhead groups. You configure 2 overhead keys. Define rates for each of this overhead key. These two overhead keys is then assigned to the two overhead groups. These overhead groups are attached in the costing view of the finished goods material master.