Saved Bookmarks
| 1. |
How Much Time Is/should Be Allocated For Testing Out Of Total Development Time Based On Industry Standards? |
|
Answer» 35% of the DEVELOPMENT TIME (time TAKEN for analysis and CODING)should be allocated for the testing process. 35% of the development time (time taken for analysis and coding)should be allocated for the testing process. |
|