If A Alone Can Do A Piece Of Work In 8 Days And B Alone Can Do The Same Work In 12 Days. How Many Days A And B Required To Finish The Same Work If They Work Togather?

Answer»

A alone ONE day WORK = 1/8

B alone one day work = 1/12

Both A and B one day work = (1/8 + 1/12) = (3/24 + 2/24)

= 5/24

so A and B TOGETHER finish the work in 24/5 day 

or 4 4/5 days.

A alone one day work = 1/8

B alone one day work = 1/12

Both A and B one day work = (1/8 + 1/12) = (3/24 + 2/24)

= 5/24

so A and B together finish the work in 24/5 day 

or 4 4/5 days.