1.

If A can complete work in 6 days, B can complete the work in 8 days and C can complete the same work in 12 days. In how much time A, B, and C can complete the work.1. 3/4 days2. 8/3 days3. 5/2 days4. 3/8 days

Answer» Correct Answer - Option 2 : 8/3 days

Given:

A can do a work in 6 days, B can do the same work in 8 days

And C can do the same work in 12 days

Formula Used:

Efficiency ∝ 1/Time taken

Calculation:

The efficiency of A = 1/6 per day

The efficiency of B = 1/8 per day

 The efficiency of C = 1/12 per day

 A, B, C can do the same work in = ( 1/6 + 1/8 + 1/12 )

⇒ ( 4 + 3 + 2 )/24 = 9/24

∴ Time taken to complete work is 8/3 days.