InterviewSolution
Saved Bookmarks
| 1. |
If Idoc Has Been Changed In R/3 Then What Should Be Done With Respect To Pi? |
|
Answer» Go to transaction IDX2 --> DELETE the OLD IDOC structure and LOAD the new IDOC structure Go to transaction IDX2 --> Delete the old IDOC structure and Load the new IDOC structure |
|