1.

If Idoc Has Been Changed In R/3 Then What Should Be Done With Respect To Pi?

Answer»

Go to transaction IDX2 --> DELETE the OLD IDOC structure and LOAD the new IDOC structure

Go to transaction IDX2 --> Delete the old IDOC structure and Load the new IDOC structure



Discussion

No Comment Found