If K men can do a piece of work in K days, then the number of days in which Y men can do the same work is:1. Y2/K days2. K2/Y days3. K/Y days4. None of these |
|
Answer» Correct Answer - Option 2 : K2/Y days Given: K men can do the work in K days Formula used: Time = Total work/Efficiency Calculation: Total work = K × K = K2 Time taken by Y to do the work = K2/Y days ∴ The required time taken is K2/Y days |
|