Infrastructural details of country Normans Land. - Maximum possible electricity production in a year (in kwh) = Generating capacity in kw × number if hours in a year - Capacity utilization % =Actual electricity productionMaximum possible electricity production× 100 The ratio of mobile to landline connections in 2005 is 2 : 3.Mobile connections increase by 30% and landline connections increased by 5% then find the % increase in the total number of phone connections (mobile & landline) from 2005 to 2009?

Answer»

Infrastructural details of country Normans Land.

- Maximum possible electricity production in a year (in kwh) = Generating capacity in kw × number if hours in a year
- Capacity utilization % =Actual electricity productionMaximum possible electricity production× 100

The ratio of mobile to landline connections in 2005 is 2 : 3.Mobile connections increase by 30% and landline connections increased by 5% then find the % increase in the total number of phone connections (mobile & landline) from 2005 to 2009?




Discussion

No Comment Found

Related InterviewSolutions