1.

Mention some of the key differences between Scrum and Kanban?

Answer»
Scrum
Kanban
  • You have to do daily stand up meetings
  • Iteration is a part of Scrum
  • Task is designed and STRUCTURED in such a way that it FITS WITHIN the iteration
  • Board is reset at every sprint
  • The process INVOLVES THREE people scrum master, product owner, and scrum team
  • Retrospective is required
  • Daily stand up meeting is not required
  • Iteration can be used as optional; it can be even driven
  • There is no size limit for the task
  • Board is more or less remains same
  • There are no defined roles
  • Retrospective is not required


Discussion

No Comment Found