1.

Mention the four work guidelines to be considered while executing MGNREGS works.

Answer»

The four work guidelines to be adopted:

i. Only those works can be taken up which result in creation of durable assets and strengthen livelihood resources of the rural poor. 

ii. As per Para 4(2), Schedule I, the order of priority of works shall be determined by each Gram Panchayat in the meetings of the Gram Sabha keeping in view potential of the local area, its needs, local resources. 

iii. The 60:40 ratio for wage and material costs should be maintained at GP level for all works to be taken up by GP and for works to be taken up by agencies other than GP, it should be maintained at the Block/ Intermediate Panchayat level. 

iv. As far as practicable, works executed by the programme implementation agencies shall be performed by using manual labour and no labour displacing machines shall be used (Para 22, Schedule I).