Saved Bookmarks
| 1. |
Ratio of work efficiencies of A, B and C is 9 : 10 : 12 and they can finish a particular wok working together is 3 days. What is the ratio of the time required if they worked individually?1. 20 : 18 : 152. 20 : 15 : 183. 20 : 18 : 164. 18 : 16 : 155. None of these |
|
Answer» Correct Answer - Option 1 : 20 : 18 : 15 Given: Ratio of efficiency of A, B and C = 9 : 10 : 12 Time taken by them to finish the job working together = 3 days Formula used: Total work = work done rate × time Calculations: Let us assume, efficiencies of A, B and C are 9x, 10x and 12x respectively. Working together, amount of work done by them/day = (9x + 10x + 12x) = 31x Total work = 31x × 3 = 93x If A works alone, time required to finish = 93x/9x = 31/3 days If B works alone, time required to finish = 93x/10x = 93/10 days If C works alone, time required to finish = 93x/12x = 93/12 days Required ratio = 31/3 : 93/10 : 93/12 = 1/3 : 3/10 : 3/12 = 20 : 18 : 15 |
|