Read the following table. The table below shows the estimated cost (in Rs. Lakhs) of a project of laying of a railway line between two places.Now answer the following questions. 1) What does the above table show?2) What is the total cost spent on laying the railway line?3) In which year very least total amount is spent?a) 1991 b) 1990 c) 19884) In which year maximum amount is spent?a) 1989 b) 1990 c) 19915) In which year the maximum amount is spent on Cement?a) 1988 b) 1989c) 1989 |
|
Answer» 1. The table shows the estimated cuts of a project of laying a railway line between two places. 2. 705.3 lakh rupees. 3. c) 1988 4. a) 1989 5. b) 1989 |
|