InterviewSolution
Saved Bookmarks
| 1. |
Solve:(1) Ajit carries a load of 17 kg from the ground on his head and takes it to the height of 2 m from the ground. Calculate the work done by him. (333.2 J)(2) The velocity of a car increases from 54 km/hr to 72 km/hr. If the mass of the car is 1500 kg find the work done to increase the velocity. (131250 J) |
|
Answer» Solve: (1) Ajit carries a load of 17 kg from the ground on his head and takes it to the height of 2 m from the ground. Calculate the work done by him. (333.2 J) (2) The velocity of a car increases from 54 km/hr to 72 km/hr. If the mass of the car is 1500 kg find the work done to increase the velocity. (131250 J) |
|