Suman Ltd. produces a product Zenu' which is sold in a 20 kg. packet. The standard cost card per packet 18. Standard costing.of Zenu' are as follows:₹1,800Direct Materials (20 kg @ Rs. 9 per kg.)800Direct Labour (16 hours @ Rs. 50 per hour)160Variable overhead (16 hours @ Rs. 10 per hour)200Fixed overhead2.960Budgeted output for the last quarter was 20000 kg. Actual output is 18000 kg.Rs.Direct materials (17800 kg @ Rs. 92 per kg)16,37,600Direct Labour (14000 hours @ Rs. 52 per kg)7,28,000Variable overhead incurred1,45,000Fixed overhead incurred1,92,000You are required to calculate:(a) Material usage variance(b) Material Price variance(c) Labour rate variance(d) Labour efficiency variance(e) Variable overhead cost variance(f) Fixed overhead Cost variance.​