1.

The question below consists of a set of labelled sentences. These sentences, when properly sequenced form a coherent paragraph. Select the mostlogical order of sentences from among the options. P: About 30 new hydro projects are now under execution with an installed capacity of 5,600 MW.Q: However, with the rapid increase in demand for power, higher priority was given to the pithead super thermal power stations as their gestation period wassmaller than that of the hydel schemes.R: Many projects were taken up for exe cution after independence and at one time (1962-63), the capacity contribution from hydro schemes was equal to thermalschemes.S: The fir st hydro generating unit in India was commissioned in Darjeeling (W.Bengal) in 1897.1). RQPS2). SRQP3).QPSR4).PQRS

Answer»


Discussion

No Comment Found

Related InterviewSolutions