The switch to backup power must be completed within a deadline of(a) 50 ms(b) 55 ms(c) 70 ms(d) 100 msI got this question during a job interview.The doubt is from Embedded Software topic in portion Advanced Software Engineering of Software Engineering |
|
Answer» Correct choice is (a) 50 ms |
|