Saved Bookmarks
| 1. |
Total cost in the short-run is classified into fixed costs and variable costs. Which one of the following is a variable cost? (a) Cost of raw material (b) Cost of equipment (c) Interest payment on past borrowings (d) Payment of rent on building |
|
Answer» (a) Cost of raw material |
|