InterviewSolution
Saved Bookmarks
| 1. |
What are the different types of MRP run? |
|
Answer» NetChange In this run system consider those material which has undergone some changes from the previous MRP run. NetChange in planning horizon This run considers the requirement in predefined planning horizon and not like net change which check the future requirements. In this run, system consider only those material which has undergone some changes from their last MRP run. Regenerative Planning In this run, system consider all the material irrespective of changes and it is time consuming and not common in Production planning. |
|