The Projects under these guidelines fall within two broad categories i.e.(a) the projects connected to HT voltage at distribution network (i.e. below 33 KV) (b) the projects connected to LT voltage i.e. 400/415/440 VOLTS (3-phase) as the case may be or 230 volts (1-phase). Accordingly, the projects may be under the following two categories.

Category 1: Projects connected at HT LEVEL (below33kV) of distribution network:

The Projects with proposed installed capacity of MINIMUM 50 kW and upto 500 kW and connected at below 33kV shall fall within this category. The projects will have to follow appropriate technical connectivity standards in this regard.

Category 2: Projects connected at LT level (400 Volts-3 phase or 230 Volts-1 phase):

The Projects with proposed installed capacity of less than100kW and connected of the grid at LT level (400/ 415/ 440 volts for 3-phase or 230V for1-phase) shall fall within this category.

The Projects under these guidelines fall within two broad categories i.e.(a) the projects connected to HT voltage at distribution network (i.e. below 33 kV) (b) the projects connected to LT voltage i.e. 400/415/440 volts (3-phase) as the case may be or 230 volts (1-phase). Accordingly, the projects may be under the following two categories.

Category 1: Projects connected at HT level (below33kV) of distribution network:

The Projects with proposed installed capacity of minimum 50 kW and upto 500 kW and connected at below 33kV shall fall within this category. The projects will have to follow appropriate technical connectivity standards in this regard.

Category 2: Projects connected at LT level (400 Volts-3 phase or 230 Volts-1 phase):

The Projects with proposed installed capacity of less than100kW and connected of the grid at LT level (400/ 415/ 440 volts for 3-phase or 230V for1-phase) shall fall within this category.