InterviewSolution
Saved Bookmarks
| 1. |
What Configuration Needs To Done For Using Mixed Costing? |
|
Answer» Quantity Structure type for mixed costing must be CONFIGURED. Here we SPECIFY the time dependency of the structure type . The following OPTIONS EXIST
This quantity structure type is then assigned to the costing VERSION. Quantity Structure type for mixed costing must be configured. Here we specify the time dependency of the structure type . The following options exist This quantity structure type is then assigned to the costing version. |
|