1.

What Drawbacks Do Manual Load Tests Have?

Answer»

The manual load testing drawbacks are:

  • It is very expensive to do Manual Testing, as real users charge by the hour.
  • With manual load testing, load testing for longer durations LIKE for 7 days won’t be possible, as users really WORK a MAXIMUM of eight hours daily.
  • You will not get accuracy for results correlation as there are delays between actions of users.
  • It is hard to do results collection as the results CAPTURE each other.
  • It is hard to do.

The manual load testing drawbacks are:



Discussion

No Comment Found