1.

What Is A General Purpose Scheduling Tool?

Answer»

The BASIC purpose of the scheduling TOOL in a DW Application is to stream line the flow of DATA from Source To Target at SPECIFIC time or based on some condition.

The basic purpose of the scheduling tool in a DW Application is to stream line the flow of data from Source To Target at specific time or based on some condition.



Discussion

No Comment Found